SERBIA has moved irreversibly into the future, with fast, strong steps, said today the President Aleksandar Vučić, who attended the beginning of the works on the construction of the bypass around Gornji Milanovac.
Photo: Instagram
This bypass is part of the access road from the Takovo loop on the “Miloš Veliki” highway to Gornji Milanovac.
By visiting that construction site, Vučić started touring the works on infrastructure projects in the Moravica district and on that occasion said that Gornji Milanovac needed new investments, and that this bypass and the connection with the “Miloš Veliki” highway would mean a lot for the development of this area. that in Gornji Milanovac the salary has increased a lot in the previous period, but that it is still well below the average.
The contract for the works on the 30-kilometer section, of which 9.4 kilometers is only the bypass around Gornji Milanovac, was signed on November 12 in the Serbian Presidency by the Minister of Construction, Transport and Infrastructure Tomislav Momirovic, representatives of Serbian Roads and the Chinese construction company Power Construction Corporation. of China (PowerChina).
Follow us through iOS and android apps